Pre-manufactured value
Pre-manufactured value (PMV) is a measure of the extent of offsite construction used on a project.
A project that is predominantly of traditional construction will have a low PMV, whereas a modular construction project would be likely to have a high PMV.
PMV can be calculated based on aspects of the project such as quantity of material manufactured offsite, percentage by volume of precast components and so on. The Department for Education defines PMV as (materials + offsite labour) / (materials + offsite labour + on site labour). Quantitative approaches such as this require that data is available in a suitable format and in sufficient detail to allow comprehensive calculations to be undertaken.
Alternatively a more qualitative approach can be adopted, describing PMV as high, medium or low.
Ref Methodology for quantifying the benefits of offsite construction, Tercia Jansen van Vuuren, CIRIA C792, 2020.
NB DfMA Overlay to the RIBA Plan of Work, Mainstreaming Design for Manufacture and Assembly in Construction, 2nd Edition, published by the RIBA in 2021, defines pre-manufactured value (PMV) as: ‘A proxy measure of project efficiency calculated as the project’s gross capital cost less the cost of prelims (site overheads) and site labour, divided by the gross capital cost, expressed as a percentage. The business-as-usual benchmark is 40%; anything higher has more of its operations conducted off site.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.